Development of Full-automatic and Intelligent Scheduling and Loading System
For problems of slow traffic, large labor strength and low efficiency of existing artificial scheduling, weighting and loading mode of mine vehicle, a full-automatic and intelligent scheduling and loading system was developed which was suitable for multi-point cross working. The whole design scheme...
Main Authors: | , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2012-09-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/id/8603 |