A predictive protocol to obtain maximum water-free oil production rate for perforated vertical wells
Abstract Producing an oilfield in a cost-effective way depends on how long water production could be delayed in the reservoir. Many flow mechanisms, correlations, and methods to calculate maximum water-free oil production rate have been published, However, those methods have generally failed to not...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
SpringerOpen
2020-10-01
|
Series: | Journal of Petroleum Exploration and Production Technology |
Subjects: | |
Online Access: | https://doi.org/10.1007/s13202-020-01014-z |