A predictive protocol to obtain maximum water-free oil production rate for perforated vertical wells

Abstract Producing an oilfield in a cost-effective way depends on how long water production could be delayed in the reservoir. Many flow mechanisms, correlations, and methods to calculate maximum water-free oil production rate have been published, However, those methods have generally failed to not...

Full description

Bibliographic Details
Main Authors: James O. Adeleye, Olugbenga Olamigoke, Oluseun T. Mumuni
Format: Article
Language:English
Published: SpringerOpen 2020-10-01
Series:Journal of Petroleum Exploration and Production Technology
Subjects:
Online Access:https://doi.org/10.1007/s13202-020-01014-z