Determining the Difference between Predicted vs. Actual Lighting Use in Higher Education Corridors
The performance gap is a measure of the difference between design assumptions and actual in field data. Estimating terms, specifically the operational hours of use, when making such design assumptions in order to predict the impact of lighting upgrades can potentially result in either an overestimat...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Frontiers Media S.A.
2017-11-01
|
Series: | Frontiers in Mechanical Engineering |
Subjects: | |
Online Access: | http://journal.frontiersin.org/article/10.3389/fmech.2017.00011/full |