Vibration analysis of vertical shaft tower structures of Muduchaideng Coal Mine

There is a hoisting system in 68.37 m floor of vertical shaft tower of Muduchaideng Coal Mine. When vertical shaft hoisters were in full speed of 13 m/s ,the middle floor structure of the seventh floor's west side and the sixth floor's north side and south side would occur an enormous vibr...

Full description

Bibliographic Details
Main Authors: XIE Mingjun, GUAN Wei, ZENG Dejun
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2017-06-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.06.006