Vibration analysis of vertical shaft tower structures of Muduchaideng Coal Mine
There is a hoisting system in 68.37 m floor of vertical shaft tower of Muduchaideng Coal Mine. When vertical shaft hoisters were in full speed of 13 m/s ,the middle floor structure of the seventh floor's west side and the sixth floor's north side and south side would occur an enormous vibr...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2017-06-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.06.006 |