OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)

Abstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the r...

Full description

Bibliographic Details
Main Authors: Anak Agung Diah Parami Dewi, Anak Agung Gede Agung Yana, Kadek Yasasi Dwinanjaya
Format: Article
Language:Indonesian
Published: Universitas Udayana 2021-04-01
Series:Jurnal Ilmiah Teknik Sipil
Online Access:https://ojs.unud.ac.id/index.php/jits/article/view/70911
_version_ 1819014212825907200
author Anak Agung Diah Parami Dewi
Anak Agung Gede Agung Yana
Kadek Yasasi Dwinanjaya
author_facet Anak Agung Diah Parami Dewi
Anak Agung Gede Agung Yana
Kadek Yasasi Dwinanjaya
author_sort Anak Agung Diah Parami Dewi
collection DOAJ
description Abstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the remaining approximately one month deadline for working days, due to some constraints at the initial stage or determination zero point building level, mobility of tools and materials that hinder and limited Human Resources. Delays in work on the West Amlapura Market development project can be anticipated by accelerating the implementation of the project, with the hope that costs will be minimal while still paying attention to the established quality standards. This study aims to analyze the optimum time and cost by adding labor. This study uses the Least Cost Analysis method which aims to obtain the optimal project duration with the minimum total project cost calculated from activities that have the lowest cost slope. The data required in this study are secondary data in the form of a Budget Plan (RAB), Time Schedule and a List of Unit Price Analysis obtained from the contractor. Based on the calculation of the least cost analysis with the addition of optimum compression labor, it is found that the reduction in the duration of completion is 52 days from a late time of 133 days to 81 days with a total cost of Rp. 11,759,553,889, direct costs of Rp. 11,481,213,347 and indirect costs of Rp. Rp. 278,340,542, -
first_indexed 2024-12-21T02:12:15Z
format Article
id doaj.art-a365c83b24a9493db7005942c2e2f17e
institution Directory Open Access Journal
issn 1411-1292
2541-5484
language Indonesian
last_indexed 2024-12-21T02:12:15Z
publishDate 2021-04-01
publisher Universitas Udayana
record_format Article
series Jurnal Ilmiah Teknik Sipil
spelling doaj.art-a365c83b24a9493db7005942c2e2f17e2022-12-21T19:19:21ZindUniversitas UdayanaJurnal Ilmiah Teknik Sipil1411-12922541-54842021-04-0116817470911OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)Anak Agung Diah Parami DewiAnak Agung Gede Agung YanaKadek Yasasi DwinanjayaAbstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the remaining approximately one month deadline for working days, due to some constraints at the initial stage or determination zero point building level, mobility of tools and materials that hinder and limited Human Resources. Delays in work on the West Amlapura Market development project can be anticipated by accelerating the implementation of the project, with the hope that costs will be minimal while still paying attention to the established quality standards. This study aims to analyze the optimum time and cost by adding labor. This study uses the Least Cost Analysis method which aims to obtain the optimal project duration with the minimum total project cost calculated from activities that have the lowest cost slope. The data required in this study are secondary data in the form of a Budget Plan (RAB), Time Schedule and a List of Unit Price Analysis obtained from the contractor. Based on the calculation of the least cost analysis with the addition of optimum compression labor, it is found that the reduction in the duration of completion is 52 days from a late time of 133 days to 81 days with a total cost of Rp. 11,759,553,889, direct costs of Rp. 11,481,213,347 and indirect costs of Rp. Rp. 278,340,542, -https://ojs.unud.ac.id/index.php/jits/article/view/70911
spellingShingle Anak Agung Diah Parami Dewi
Anak Agung Gede Agung Yana
Kadek Yasasi Dwinanjaya
OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
Jurnal Ilmiah Teknik Sipil
title OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_full OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_fullStr OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_full_unstemmed OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_short OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_sort optimalisasi waktu dan biaya pelaksanaan proyek menggunakan metode least cost analysis studi kasus pembangunan pasar amlapura barat
url https://ojs.unud.ac.id/index.php/jits/article/view/70911
work_keys_str_mv AT anakagungdiahparamidewi optimalisasiwaktudanbiayapelaksanaanproyekmenggunakanmetodeleastcostanalysisstudikasuspembangunanpasaramlapurabarat
AT anakagunggedeagungyana optimalisasiwaktudanbiayapelaksanaanproyekmenggunakanmetodeleastcostanalysisstudikasuspembangunanpasaramlapurabarat
AT kadekyasasidwinanjaya optimalisasiwaktudanbiayapelaksanaanproyekmenggunakanmetodeleastcostanalysisstudikasuspembangunanpasaramlapurabarat