OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
Abstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the r...
Main Authors: | Anak Agung Diah Parami Dewi, Anak Agung Gede Agung Yana, Kadek Yasasi Dwinanjaya |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Universitas Udayana
2021-04-01
|
Series: | Jurnal Ilmiah Teknik Sipil |
Online Access: | https://ojs.unud.ac.id/index.php/jits/article/view/70911 |
Similar Items
-
ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN PEKERJAAN ANTARA PLAT LANTAI BONDEK DENGAN KONVENSIONAL (STUDI KASUS : PROYEK PEMBANGUNAN RSU GARBAMED-KEROBOKAN)
by: I Gede Putu Joni, et al.
Published: (2020-01-01) -
Optimalisasi Biaya dan Waktu Pelaksanaan Proyek Pembangunan Kantor Dinas Peternakan Kabupaten Bone Bolango dengan Metode Least Cost Analysis
by: Fikri A. Paramata, et al.
Published: (2019-06-01) -
Hirarki Kendala dalam Penerapan Metode Design Build dalam Pengadaan Proyek Infrastruktur Jalan: Delphi Study
by: Anak Agung Diah Parami Dewi, et al.
Published: (2022-07-01) -
PENGARUH KEPEMIMPINAN TERHADAP KINERJA DAN STRES PEKERJA PADA PROYEK JALAN RAYA DI KOTA DENPASAR
by: Anak Agung Diah Parami, et al.
Published: (2018-06-01) -
ANALISIS PENERAPAN SISTEM MANAJEMEN KESEHATAN DAN KESELAMATAN KERJA (K3) PADA PROYEK PEMBANGUNAN RUANG PERAWATAN WING UTARA TAHAP 1 RSU PAYANGAN
by: Anak Agung Diah Parami Dewi, et al.
Published: (2022-07-01)