DEVELOPMENT OF A PREMIUM COLD MIX ASPHALT
Cold mix asphalt produced using conventional emulsion and limestone filler has three main disadvantages, namely low early strength due to high amount of water within the mix, long curing time ranging from 2-24 months and high air voids content. In this study, the effect of a novel technology for...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Engineering, University of Kufa
2023-07-01
|
Series: | Mağallaẗ Al-kūfaẗ Al-handasiyyaẗ |
Subjects: | |
Online Access: | https://journal.uokufa.edu.iq/index.php/kje/article/view/10805 |