Preliminary Report on the Effect of Pre-Boring on the Mobilized Friction Capacity of Pile Foundation Hydraulically Jacked into Expansive Soil

Pre-drilling was performed to reduce lateral earth pressure generated by pile foundation hydraulically jacked into expansive soil. Nineteen prestressed-precast spun concrete pile with diameter of 800 mm were penetrated into expansive soil up the depth of 40 m. Pre-drilling with diameter of 700 mm wa...

Full description

Bibliographic Details
Main Author: Budi G.S.
Format: Article
Language:English
Published: Petra Christian University 2015-01-01
Series:Civil Engineering Dimension
Subjects:
Online Access:http://puslit2.petra.ac.id/ejournal/index.php/civ/article/view/19208