PEMBERSIH UDARA BUANG PADA BOILER (KETEL) UAP DENGAN MENGGUNAKAN ELECTROSTATIC PRECIPITATOR (ESP) PADA PLTU ASAM-ASAM
Asam-asam Steam Power (power plant) is the powerhouse that has an installed capacity of 260Mw (4x65Mw) which is expected to meet the requirement of power supply in the region of South Kalimantan and Central Kalimantan. In keeping operations of the entire electricity power generation equipment can ru...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
UPT Publikasi dan Pengelolaan Jurnal Universitas Islam Kalimantan Muhammad Arsyad Al Banjari
2017-05-01
|
Series: | Al-Ulum |
Online Access: | https://ojs.uniska-bjm.ac.id/index.php/JST/article/view/760 |