A Multi-Objective Programming to Increase Labor Efficiency of a Truck Hub: A Case Study
The problem of staff scheduling at a truck hub for loading and stripping of the trucks is an important and difficult problem to optimize the labor efficiency and cost. The trucks enter the hub at different hours a day, in different known time schedules and operating hours. In this paper, we propose...
Format: | Article |
---|---|
Language: | English |
Published: |
Iran University of Science & Technology
2012-06-01
|
Series: | International Journal of Industrial Engineering and Production Research |
Subjects: | |
Online Access: | http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-49-2&slc_lang=en&sid=1 |