VPP Participation in the FCR Cooperation Considering Opportunity Costs

Currently, the transmission system operators (TSOs) from Portugal and Spain do not procure a frequency containment reserve (FCR) through market mechanisms. In this context, a virtual power plant (VPP) that aggregates sources, such as wind and solar power and hydrogen electrolyzers (HEs), would benef...

Full description

Bibliographic Details
Main Authors: Fernando J. Ribeiro, João A. Peças Lopes, Filipe J. Soares, André G. Madureira
Format: Article
Language:English
Published: MDPI AG 2024-04-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/14/7/2985