VPP Participation in the FCR Cooperation Considering Opportunity Costs
Currently, the transmission system operators (TSOs) from Portugal and Spain do not procure a frequency containment reserve (FCR) through market mechanisms. In this context, a virtual power plant (VPP) that aggregates sources, such as wind and solar power and hydrogen electrolyzers (HEs), would benef...
Main Authors: | Fernando J. Ribeiro, João A. Peças Lopes, Filipe J. Soares, André G. Madureira |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-04-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/14/7/2985 |
Similar Items
-
EFFECTS OF ETHANOL ON DIFFERENT ORGANS AND ON FCR IN QUAILS (COTURNIX JAPONICA)
by: M. TARIQ JAVED, M. KHURAM SAEED, M. IRFAN, M. SIDDIQUE1 AND M. CAGIOLA2
Published: (2008-07-01) -
Secondary malignancies and survival of FCR‐treated patients with chronic lymphocytic leukemia in Central Europe
by: Fruzsina Kósa, et al.
Published: (2023-01-01) -
Ethanol through Crop Route in Broilers: Effects on FCR, Live Weight and on Different Organs
by: A. Naqi, M. Tariq Javed*, M. Suleman, M. Bashir and M. Irfan
Published: (2011-01-01) -
Optimal VPP Operation Considering Network Constraint Uncertainty of DSO
by: Sang-Yoon Park, et al.
Published: (2023-01-01) -
GROWTH PERFORMANCE AND FEED CONVERSION RATIO (FCR) OF HYBRID FINGERLINGS (CATLA CATLA X LABEO ROHITA) FED ON COTTONSEED MEAL, SUNFLOWER MEAL AND BONE MEAL
by: T. SAHZADI, M. SALIM, UM-E-KALSOOM AND K. SHAHZAD
Published: (2006-10-01)