The Mineralogy Characteristics of Overflow Product from Hydrocyclone in the Jiaojia Gold Mine

The capacity of ore treatment reached 12,000 t/d and gold recovery achieved 92% in the Jiaojia Gold Mine. Broken product has been washed with double spiral classifier, and the ore slime yield was 7%. The ore slime had also been flotation selected alone, which realized preliminary separation between...

Full description

Bibliographic Details
Main Authors: HU Hai-xiang, FAN Zuo-peng, NIU Gui-qiang, LIU Hong-lan, LIU Hai-long, WANG Pan-zhi
Format: Article
Language:English
Published: Science Press, PR China 2014-07-01
Series:Yankuang ceshi
Subjects:
Online Access:http://www.ykcs.ac.cn/en/article/id/97ae7b9d-254e-4190-92b2-245a5006efff