Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
Along with the load-shedding problem that Eskom is having with the current generation system, the operator is forced to use its peaking plants at Ankerlig and Gourikwa in the Western Cape much more than planned. The two plants are set up for dual fuel operations, able to be fuelled with diesel as w...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Cape Town
2022-06-01
|
Series: | Journal of Energy in Southern Africa |
Online Access: | https://energyjournal.africa/article/view/13453 |