Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa

Along with the load-shedding problem that Eskom is having with the current generation system, the operator is forced to use its peaking plants at Ankerlig and Gourikwa in the Western Cape much more than planned. The two plants are set up for dual fuel operations, able to be fuelled with diesel as w...

Full description

Bibliographic Details
Main Authors: S. Clark, C. McGregor, J.L. van Niekerk
Format: Article
Language:English
Published: University of Cape Town 2022-06-01
Series:Journal of Energy in Southern Africa
Online Access:https://energyjournal.africa/article/view/13453
_version_ 1818555223811031040
author S. Clark
C. McGregor
J.L. van Niekerk
author_facet S. Clark
C. McGregor
J.L. van Niekerk
author_sort S. Clark
collection DOAJ
description Along with the load-shedding problem that Eskom is having with the current generation system, the operator is forced to use its peaking plants at Ankerlig and Gourikwa in the Western Cape much more than planned. The two plants are set up for dual fuel operations, able to be fuelled with diesel as well as gas. As Eskom does not have access to natural gas, both plants have been fuelled with diesel. For the last three years, 2019 through 2021, Eskom has expended an average of over R4 billion per year on diesel fuel for its peaking plants, with the majority of this at Ankerlig and Gourikwa. For 2022, in their request for a rate increase, Eskom noted that their anticipated diesel fuel expenditures will increase to over R6.5 billion. This could be reduced by more than half if the plants were fuelled with natural gas. The problem Eskom faces is sourcing natural gas to fuel these plants. There has been consideration of liquefied natural gas importation into the Western Cape that could be utilised to fuel the Ankerlig plant. However, the high capital cost for this option has led to delay in the commencement of this project. There is another alternative that can be implemented in a short time-frame, using currently available gas, in the form of liquefied petroleum gas. With this fuel, the Ankerlig peaking plant could be switched to gas fuel and Eskom would have a significant reduction in the cost of fuel. In this study the economic benefit of this fuel change option is analysed.
first_indexed 2024-12-12T09:50:29Z
format Article
id doaj.art-aa629875af784c5f8c73df3cbb14deda
institution Directory Open Access Journal
issn 1021-447X
2413-3051
language English
last_indexed 2024-12-12T09:50:29Z
publishDate 2022-06-01
publisher University of Cape Town
record_format Article
series Journal of Energy in Southern Africa
spelling doaj.art-aa629875af784c5f8c73df3cbb14deda2022-12-22T00:28:17ZengUniversity of Cape TownJournal of Energy in Southern Africa1021-447X2413-30512022-06-0133210.17159/2413-3051/2022/v33i2a13453Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South AfricaS. Clark0C. McGregor1J.L. van Niekerk2Solar Thermal Energy Research Group, Department of Mechanical and Mechatronic Engineering, Stellenbosch University, Stellenbosch, South AfricaSolar Thermal Energy Research Group, Department of Mechanical and Mechatronic Engineering, Stellenbosch University, Stellenbosch, South AfricaSolar Thermal Energy Research Group, Department of Mechanical and Mechatronic Engineering, Stellenbosch University, Stellenbosch, South Africa Along with the load-shedding problem that Eskom is having with the current generation system, the operator is forced to use its peaking plants at Ankerlig and Gourikwa in the Western Cape much more than planned. The two plants are set up for dual fuel operations, able to be fuelled with diesel as well as gas. As Eskom does not have access to natural gas, both plants have been fuelled with diesel. For the last three years, 2019 through 2021, Eskom has expended an average of over R4 billion per year on diesel fuel for its peaking plants, with the majority of this at Ankerlig and Gourikwa. For 2022, in their request for a rate increase, Eskom noted that their anticipated diesel fuel expenditures will increase to over R6.5 billion. This could be reduced by more than half if the plants were fuelled with natural gas. The problem Eskom faces is sourcing natural gas to fuel these plants. There has been consideration of liquefied natural gas importation into the Western Cape that could be utilised to fuel the Ankerlig plant. However, the high capital cost for this option has led to delay in the commencement of this project. There is another alternative that can be implemented in a short time-frame, using currently available gas, in the form of liquefied petroleum gas. With this fuel, the Ankerlig peaking plant could be switched to gas fuel and Eskom would have a significant reduction in the cost of fuel. In this study the economic benefit of this fuel change option is analysed. https://energyjournal.africa/article/view/13453
spellingShingle S. Clark
C. McGregor
J.L. van Niekerk
Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
Journal of Energy in Southern Africa
title Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
title_full Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
title_fullStr Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
title_full_unstemmed Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
title_short Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa
title_sort using liquefied petroleum gas to reduce the operating cost of the ankerlig peaking power plant in south africa
url https://energyjournal.africa/article/view/13453
work_keys_str_mv AT sclark usingliquefiedpetroleumgastoreducetheoperatingcostoftheankerligpeakingpowerplantinsouthafrica
AT cmcgregor usingliquefiedpetroleumgastoreducetheoperatingcostoftheankerligpeakingpowerplantinsouthafrica
AT jlvanniekerk usingliquefiedpetroleumgastoreducetheoperatingcostoftheankerligpeakingpowerplantinsouthafrica