Thermo-Economic Analysis of A Geothermal Binary Power Plant in Indonesia—A Pre-Feasibility Case Study of the Wayang Windu Site

Indonesia has a predicted geothermal potential of 29 GWe, which is the biggest in the world. With this potential, the government has the ambitious target to generate as much as 7 GWe of electricity in 2025 from geothermal energy. However, the installed capacity of geothermal power plant in Indonesia...

Full description

Bibliographic Details
Main Authors: Andreas Diga Pratama Putera, Annisa Nurul Hidayah, Alison Subiantoro
Format: Article
Language:English
Published: MDPI AG 2019-11-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/12/22/4269