Development of construction duration prediction model for project planning phase of mixed-use buildings
The nature of the mixed-use building’s characteristics should be considered to calculate a proper construction duration for mixed-use buildings in the project planning phase. However, the existing construction duration prediction models are incapable to reflect nature as they were developed mainly f...