Development of construction duration prediction model for project planning phase of mixed-use buildings
The nature of the mixed-use building’s characteristics should be considered to calculate a proper construction duration for mixed-use buildings in the project planning phase. However, the existing construction duration prediction models are incapable to reflect nature as they were developed mainly f...
Main Authors: | Yoo-Jun Kim, Dong-Jun Yeom, Young Suk Kim |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2019-11-01
|
Series: | Journal of Asian Architecture and Building Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/13467581.2019.1696207 |
Similar Items
-
Developing a construction-duration model based on a historical dataset for building project / Statybų projekto realizavimo trukmės modelio, pagrįsto istoriniais duomenimis, kūrimas
by: Ming-Chiao Lin, et al.
Published: (2011-12-01) -
Variations in Building Construction Projects in Ghana: A Public Organisational Perspective
by: Akomah Benjamin Boahene, et al.
Published: (2023-01-01) -
THE IMPACT OF PREPARATION OF INITIAL PERMISSIVE DOCUMENTATION ON THE DURATION FOR REALIZATION OF INVESTMENT-CONSTRUCTION PROJECTS
Published: (2016-12-01) -
THE IMPACT OF PREPARATION OF INITIAL PERMISSIVE DOCUMENTATION ON THE DURATION FOR REALIZATION OF INVESTMENT-CONSTRUCTION PROJECTS
Published: (2019-02-01) -
Optimizing the Project Development in Transportation Systems: Economical and Mathematical Models
by: Simeon Schreiber
Published: (2003-07-01)