Study on Double Pressure Funnels and Gas-Liquid Two-Way Mass Transfer after Fracturing in Shale Gas Reservoirs
Well shut-in and drainage after shale gas fracturing are important factors affecting the productivity. Due to the imperfect optimization method of shale gas flowback, there has been no clear explanation for the problems such as “formulation of reasonable well shut-in time” and “less fracturing fluid...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi-Wiley
2022-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2022/3533827 |