Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods
The construction of the hydropower plant on the water pipelines using the excess pressure and replacement of PAT instead of the pressure reducing valve (PRV) due to positive effects such as renewable energy, the proper dispersion of water supply pipelines in different regions and short production ti...