Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods
The construction of the hydropower plant on the water pipelines using the excess pressure and replacement of PAT instead of the pressure reducing valve (PRV) due to positive effects such as renewable energy, the proper dispersion of water supply pipelines in different regions and short production ti...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Marvdasht Branch, Islamic Azad University
2020-04-01
|
Series: | مهندسی منابع آب |
Subjects: | |
Online Access: | https://wej.marvdasht.iau.ir/article_4085_d762cc2ecce692f340c1f798a716b478.pdf |
_version_ | 1797359715872669696 |
---|---|
author | Mehdi Yasi Mohammad Mohammadi Saeed Jamali Hooman Hajikandi |
author_facet | Mehdi Yasi Mohammad Mohammadi Saeed Jamali Hooman Hajikandi |
author_sort | Mehdi Yasi |
collection | DOAJ |
description | The construction of the hydropower plant on the water pipelines using the excess pressure and replacement of PAT instead of the pressure reducing valve (PRV) due to positive effects such as renewable energy, the proper dispersion of water supply pipelines in different regions and short production time are considered. On the other hand, the prioritization of the construction of the power plant on the water pipelines involves various factors, which require multi-criteria decision-making methods. In this research, the water pipelines managed by the water and wastewater company of Ilam province, including six positions, taking into account five indicators, electricity production, construction costs, distance from the place of use, distance from the main road and ease of operation using multi-criteria methods (including: hierarchical analysis, network analysis, simple weighting, VIKOR and similarity to ideal option and economic analysis). The results indicated that the entrance to the Station 1 of the Ilam Dam (with an annual production capacity of 982800 kWh, the construction cost of 1218 million Rials, with a benefit-cost ratio of 3.7 and unit cost of 407 Rials per kW) is the best alternative for the production of hydro-electrical energy. |
first_indexed | 2024-03-08T15:27:44Z |
format | Article |
id | doaj.art-b125c6322b244ecb87734649606df8f3 |
institution | Directory Open Access Journal |
issn | 2008-6377 2423-7191 |
language | fas |
last_indexed | 2024-03-08T15:27:44Z |
publishDate | 2020-04-01 |
publisher | Marvdasht Branch, Islamic Azad University |
record_format | Article |
series | مهندسی منابع آب |
spelling | doaj.art-b125c6322b244ecb87734649606df8f32024-01-10T08:11:08ZfasMarvdasht Branch, Islamic Azad Universityمهندسی منابع آب2008-63772423-71912020-04-01134413284085Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making MethodsMehdi Yasi0Mohammad Mohammadi1Saeed Jamali2Hooman Hajikandi3Associate Professor/ Department of Irrigation and Reclamation Engineering، University of TehranPh. D. Candidate، Department of Civil Engineering، Faculty of Engineering، Islamic Azad University- Tehran Central Branch، IranDepartment of Civil Engineering، Faculty of Engineering، Islamic Azad University- Tehran Central Branch، IranDepartment of Civil Engineering، Faculty of Engineering، Islamic Azad University- Tehran Central Branch، IranThe construction of the hydropower plant on the water pipelines using the excess pressure and replacement of PAT instead of the pressure reducing valve (PRV) due to positive effects such as renewable energy, the proper dispersion of water supply pipelines in different regions and short production time are considered. On the other hand, the prioritization of the construction of the power plant on the water pipelines involves various factors, which require multi-criteria decision-making methods. In this research, the water pipelines managed by the water and wastewater company of Ilam province, including six positions, taking into account five indicators, electricity production, construction costs, distance from the place of use, distance from the main road and ease of operation using multi-criteria methods (including: hierarchical analysis, network analysis, simple weighting, VIKOR and similarity to ideal option and economic analysis). The results indicated that the entrance to the Station 1 of the Ilam Dam (with an annual production capacity of 982800 kWh, the construction cost of 1218 million Rials, with a benefit-cost ratio of 3.7 and unit cost of 407 Rials per kW) is the best alternative for the production of hydro-electrical energy.https://wej.marvdasht.iau.ir/article_4085_d762cc2ecce692f340c1f798a716b478.pdfwater supply pipe lineshydropowerpatmulti-criteria decision makingcost analysis |
spellingShingle | Mehdi Yasi Mohammad Mohammadi Saeed Jamali Hooman Hajikandi Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods مهندسی منابع آب water supply pipe lines hydropower pat multi-criteria decision making cost analysis |
title | Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods |
title_full | Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods |
title_fullStr | Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods |
title_full_unstemmed | Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods |
title_short | Prioritizing the Construction of a Hydropower Plant on Water Supply Pipelines Using Multi-Criteria Decision-Making Methods |
title_sort | prioritizing the construction of a hydropower plant on water supply pipelines using multi criteria decision making methods |
topic | water supply pipe lines hydropower pat multi-criteria decision making cost analysis |
url | https://wej.marvdasht.iau.ir/article_4085_d762cc2ecce692f340c1f798a716b478.pdf |
work_keys_str_mv | AT mehdiyasi prioritizingtheconstructionofahydropowerplantonwatersupplypipelinesusingmulticriteriadecisionmakingmethods AT mohammadmohammadi prioritizingtheconstructionofahydropowerplantonwatersupplypipelinesusingmulticriteriadecisionmakingmethods AT saeedjamali prioritizingtheconstructionofahydropowerplantonwatersupplypipelinesusingmulticriteriadecisionmakingmethods AT hoomanhajikandi prioritizingtheconstructionofahydropowerplantonwatersupplypipelinesusingmulticriteriadecisionmakingmethods |