A modified back analysis method for deep excavation with multi-objective optimization procedure
Real-time prediction of excavation-induced displacement of retaining pile during the deep excavation process is crucial for construction safety. This paper proposes a modified back analysis method with multi-objective optimization procedure, which enables a real-time prediction of horizontal displac...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2024-04-01
|
Series: | Journal of Rock Mechanics and Geotechnical Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1674775523001646 |