Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study

Abstract The double sidewall guide pit and centre cross diagram (CRD) methods are often used for the construction of large-section tunnels through water-rich fault fracture zones due to their long construction time and high construction cost. To shorten the construction period and save costs, the to...

Full description

Bibliographic Details
Main Authors: Ting Zhu, Yuanming Liu
Format: Article
Language:English
Published: Nature Portfolio 2023-09-01
Series:Scientific Reports
Online Access:https://doi.org/10.1038/s41598-023-42458-7