Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study
Abstract The double sidewall guide pit and centre cross diagram (CRD) methods are often used for the construction of large-section tunnels through water-rich fault fracture zones due to their long construction time and high construction cost. To shorten the construction period and save costs, the to...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Nature Portfolio
2023-09-01
|
Series: | Scientific Reports |
Online Access: | https://doi.org/10.1038/s41598-023-42458-7 |