Risk Analysis of the Causes of Delay in Ship Construction (Case Study of KM CL 9E Ship Construction)
In shipbuilding work, the risk of delays must be analyzed and anticipated so that such delays do not occur and cause losses for both parties. This study aims to calculate the risk of a shipbuilding project using the Failure Mode and Effect Analysis (FMEA) method. The final result obtained is the res...
Main Authors: | , |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Universitas Jember
2022-12-01
|
Series: | Berkala Sainstek |
Online Access: | https://jurnal.unej.ac.id/index.php/BST/article/view/32674 |