Application and control mechanism of double-span trusscable in coal roadway with large span
As the bottom span of single-span truss anchor cable is too large in large span roadway,effective composite high pre-stress in the central area of roadway cannot be provided.Thus,to solve the support problem,two groups of high pre-stress truss cable are arranged symmetrically to form the double-span...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Emergency Management Press
2018-04-01
|
Series: | 矿业科学学报 |
Subjects: | |
Online Access: | http://kykxxb.cumtb.edu.cn/article/id/132 |