Assessment and Prioritize Risk Factors of Financial Measurement of Management Control System for Production Companies Using a Hybrid Z-SWARA and Z-WASPAS with FMEA Method: A Meta-Analysis
The management control system in an industry is managerial, directional, hindrance, and cohesive action in order to cohere and regulate various branches and sub-branches. In fact, it is a system that supports the real state of matters in the right way. This method is intended at assuring that the pu...
المؤلفون الرئيسيون: | Sara Rahmati, Mohammad Hossein Mahdavi, Saeid Jafarzadeh Ghoushchi, Hana Tomaskova, Gholamreza Haseli |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
MDPI AG
2022-01-01
|
سلاسل: | Mathematics |
الموضوعات: | |
الوصول للمادة أونلاين: | https://www.mdpi.com/2227-7390/10/2/253 |
مواد مشابهة
-
Identifying, Assessing and Prioritizing Pressure Reduction Station Risks Using FMEA Based on SWARA-VIKOR Multi-criteria Decision-making Methods
حسب: Rajabali Hokmabadi, وآخرون
منشور في: (2022-09-01) -
An Integrated Mathematical Attitude Utilizing Fully Fuzzy BWM and Fuzzy WASPAS for Risk Evaluation in a SOFC
حسب: Zeyu Lin, وآخرون
منشور في: (2021-09-01) -
Proposta de um método para integração entre QFD e FMEA Proposal of a method to integrate QFD and FMEA
حسب: José Márcio Ramos Fernandes, وآخرون
منشور في: (2006-05-01) -
Evaluation and prioritization of barriers to the implementation of the eco-regenerative supply chains using fuzzy ZE-numbers framework in group decision-making
حسب: Zeynab Rezazadeh Salteh, وآخرون
منشور في: (2024-07-01) -
A Concept of Risk Prioritization in FMEA Analysis for Fluid Power Systems
حسب: Joanna Fabis-Domagala, وآخرون
منشور في: (2021-10-01)