Seepage and Stability Analysis of the Eyvashan Earth Dam under Drawdown Conditions

The rapid drawdown condition to control floods and irrigation is one of the things that may occur over the lifetime of the dam. Also, the stability of the dam at the rapid drawdown will be more important due to the faster reduction of the water level of the dam reservoir than the pore water pressure...

Full description

Bibliographic Details
Main Authors: Mehdi komasi, Behrang Beiranvand
Format: Article
Language:English
Published: University of Tehran Press 2021-12-01
Series:Civil Engineering Infrastructures Journal
Subjects:
Online Access:https://ceij.ut.ac.ir/article_82156_9b150079fee2eb4b2d185a8dcd7e7da8.pdf