Integrated reservoir management in a Niger Delta oil rim field
Several hundred million barrels of oil and trillions standard cubic feet of gas are enclosed within the oil rim reservoirs in the Niger Delta. The low recovery from these reservoirs can be attributed to the excessive early water and gas breakthrough at the wells which requires immediate attention. H...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2020-01-01
|
Series: | Cogent Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/23311916.2020.1812474 |