Integrated reservoir management in a Niger Delta oil rim field

Several hundred million barrels of oil and trillions standard cubic feet of gas are enclosed within the oil rim reservoirs in the Niger Delta. The low recovery from these reservoirs can be attributed to the excessive early water and gas breakthrough at the wells which requires immediate attention. H...

Full description

Bibliographic Details
Main Authors: Yetunde M. Aladeitan, Akeem O. Arinkoola, David O. Ogbe
Format: Article
Language:English
Published: Taylor & Francis Group 2020-01-01
Series:Cogent Engineering
Subjects:
Online Access:http://dx.doi.org/10.1080/23311916.2020.1812474