Design of monitoring and control system for water bursting in floor of coal seam
In order to solve problems of existing water bursting prevention methods such as large difference between theoretical parameters and actual environmental parameters, poor advanced forecast and real-time performance and so on, the paper proposed a design scheme of monitoring and control system for wa...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2013-01-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/id/8865 |