Design of monitoring and control system for water bursting in floor of coal seam
In order to solve problems of existing water bursting prevention methods such as large difference between theoretical parameters and actual environmental parameters, poor advanced forecast and real-time performance and so on, the paper proposed a design scheme of monitoring and control system for wa...
Main Authors: | LI Cai-ping, ZHANG Ying-mei, ZHANG Zhen-guo |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2013-01-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/id/8865 |
Similar Items
-
Study of hydraulic cutting as a method to prevent coal burst disasters
by: Mingbo Chi, et al.
Published: (2024-05-01) -
Characteristics and contributing factors of major coal bursts in longwall mines
by: Wusheng Zhao, et al.
Published: (2022-04-01) -
Mechanism and Prevention of Rock Burst Induced by Wide Coal Pillar in Thick Hard Coal Seam
by: LIU Weijian, MA Binwen
Published: (2020-03-01) -
Research of coal mine water burst forecasting method based on PCA-ELM
by: LI Pei, et al.
Published: (2013-09-01) -
Rock burst early-warning for thick coal seam in deep mining based on Logistic regressio
by: WU Jianbo, et al.
Published: (2017-06-01)