Optimum Scheduling of a Multi-Machine Flexible Manufacturing System Considering Job and Tool Transfer Times without Tool Delay
In order to minimize makespan (C<sub>max</sub>) without causing tool delay with the fewest copies of each tool type, this study investigates the concurrent scheduling of automated guided vehicles (AGVs), machines (MCs), tool transporter (TT), and tools in a multi-machine flexible manufac...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-10-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/11/19/4190 |