Pressure Drop Optimization of the Main Steam and Reheat Steam System of a 1000 MW Secondary Reheat Unit

The pressure drop of a main steam and reheat steam system should be optimized during the design and operation of a thermal power plant to minimize operation costs. In this study, the pressure drop of the main steam pipe and reheat steam pipe of a 1000 MW secondary reheat unit are optimized by modula...

Full description

Bibliographic Details
Main Authors: Yanfeng Li, Jingru Liu, Guohe Huang
Format: Article
Language:English
Published: MDPI AG 2022-04-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/15/9/3279