Analysis of normal operation of a rockfill dam with combination of seepage-control elements: reinforced concrete face and clay-cement-concrete wall

The paper considers results of stress-strain state analysis for a 87 m high rockfill dam that is located in the layer of soil foundation and has a combined seepage-control element. In the lower part of the dam as well as in its foundation there is fixed a grout curtain by using slurry trench cut-off...

Full description

Bibliographic Details
Main Author: M.P. Sainov
Format: Article
Language:English
Published: Peter the Great St. Petersburg Polytechnic University 2016-11-01
Series:Инженерно-строительный журнал
Subjects:
Online Access:http://engstroy.spbstu.ru/eng/index_2016_04/01.html