Optimization of Pre-Splitting Blasting Hole Network Parameters and Engineering Applications in Open Pit Mine
In order to optimize the parameters of a pre-splitting blasting hole network, taking an open-pit mine in Inner Mongolia as the engineering background, the numerical models of different pore sizes and hole spacing were established by LS-DYNA software. The stress wave propagation law, peak stress chan...
Hlavní autoři: | , , |
---|---|
Médium: | Článek |
Jazyk: | English |
Vydáno: |
MDPI AG
2022-05-01
|
Edice: | Applied Sciences |
Témata: | |
On-line přístup: | https://www.mdpi.com/2076-3417/12/10/4930 |