Perbandingan Metode Gaussian Particle Swarm Optimization (GPSO) dan Lagrange Multiplier pada Masalah Economic Dispatch
On electric power system operation, economic planning problem is one variable to take into account due to operational cost efficiency. Economic Dispatch problem of electric power generation is discussed in this study to manage the output division on several units based on the the required load deman...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Bina Nusantara University
2012-06-01
|
Series: | ComTech |
Subjects: | |
Online Access: | https://journal.binus.ac.id/index.php/comtech/article/view/2407 |