Analysis of the start-up mechanism of moraine debris flow based on flume test:A case study of the Aierkuran Gully along the Sino-Pakistan highway
Debris flow caused by moraine soil startingis very common along the Sino-Pakistan Highway, but in previous studies, the characteristics of moraine soil and its influence on the formation of glacier debris flow is lacking. In order to further explore the causes of debris flow burst, based on flume te...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of The Chinese Journal of Geological Hazard and Control
2021-02-01
|
Series: | Zhongguo dizhi zaihai yu fangzhi xuebao |
Subjects: | |
Online Access: | https://www.zgdzzhyfzxb.com/en/article/doi/10.16031/j.cnki.issn.1003-8035.2021.01.01 |