An improvement velocity inverse method for predicting the slope imminent failure time

AbstractThe slope imminent failure time prediction method could be established with the slope surface deformation time curve before rupture. However, the existing time-to-failure prediction method does not unify the calculation time range, and the forecast results derived from the same model in diff...

Full description

Bibliographic Details
Main Authors: Xing Qi, Ruliang Cao, Dalei Peng
Format: Article
Language:English
Published: Taylor & Francis Group 2023-12-01
Series:Geomatics, Natural Hazards & Risk
Subjects:
Online Access:https://www.tandfonline.com/doi/10.1080/19475705.2023.2239991