An improvement velocity inverse method for predicting the slope imminent failure time
AbstractThe slope imminent failure time prediction method could be established with the slope surface deformation time curve before rupture. However, the existing time-to-failure prediction method does not unify the calculation time range, and the forecast results derived from the same model in diff...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2023-12-01
|
Series: | Geomatics, Natural Hazards & Risk |
Subjects: | |
Online Access: | https://www.tandfonline.com/doi/10.1080/19475705.2023.2239991 |