Minimum-Energy Scheduling of Flexible Job-Shop Through Optimization and Comprehensive Heuristic
This study considers a flexible job-shop scheduling problem where energy cost savings are the primary objective and where the classical objective of the minimization of the make-span is replaced by the satisfaction of due times for each job. An original two-level mixed-integer formulation of this op...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-11-01
|
Series: | Algorithms |
Subjects: | |
Online Access: | https://www.mdpi.com/1999-4893/17/11/520 |