Multi-Time Collaborative Restoration for Integrated Electrical-Gas Distribution Systems Based on Rolling Optimization

This paper proposes a multi-time collaborative restoration model for integrated electricity-gas distribution systems (IEGDSs) considering multiple resources after extreme weather events. Based on the linearized power flow constraints of the unbalanced electrical distribution system (EDS) and gas dis...

Full description

Bibliographic Details
Main Authors: Jingyang Yun, Zheng Yan, Yun Zhou, Peichao Zhang, Weidong Hu
Format: Article
Language:English
Published: China electric power research institute 2024-01-01
Series:CSEE Journal of Power and Energy Systems
Subjects:
Online Access:https://ieeexplore.ieee.org/document/9299495/