Cost Assessment of a Tokamak Fusion Reactor with an Inventive Method for Optimum Build Determination

An inventive method was applied to determine the minimum major radius, <i>R</i><sub>0</sub>, and the optimum build of a tokamak fusion reactor that simultaneously meets all physics, engineering, and neutronics constraints. With a simple cost model, tokamak systems analyses we...

Full description

Bibliographic Details
Main Authors: Gahyung Jo, Jae-Min Kwon, Ara Cho, Hyun-Kyung Chung, Bong-Guen Hong
Format: Article
Language:English
Published: MDPI AG 2021-10-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/14/20/6817