Simulation Study of Reentry Dynamics of a Deep-Water Drilling Riser System Based on Model Predictive Control

A marine drilling riser at normal operation condition is required to disconnect the lower marine riser package (LMRP) and blow-out preventer (BOP) in case of severe weather. When the weather gets fine, it must reconnect the LMRP and the BOP. This process is called riser reentry. Marine drilling oper...

Full description

Bibliographic Details
Main Author: ZHANG Chenyu, MENG Shuai
Format: Article
Language:zho
Published: Editorial Office of Journal of Shanghai Jiao Tong University 2023-11-01
Series:Shanghai Jiaotong Daxue xuebao
Subjects:
Online Access:https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-11-1389.shtml