A Two-Machine Flow Shop Batch Scheduling Model to Minimize Total Actual Flow Time

This study introduces a scheduling model for a two-machine flow shop batch system to minimize the actual flow time. In this system, two machines are responsible for processing raw materials and producing finished products, with a single bottleneck machine. The entity overseeing the manufacturing pr...

Full description

Bibliographic Details
Main Authors: Rinto Yusriski, Andri Rachmat Kumalasian Nasution, Lukas Lukas, Linda Wijayanti, Sandra Octaviani
Format: Article
Language:English
Published: Petra Christian University 2023-12-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:https://jurnalindustri.petra.ac.id/index.php/ind/article/view/27307