Experimental Assessment of Time-Limited Operation and Rectification of a Bridge Crane
This paper describes a problem related to a casting bridge crane with a combined load of 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. Due to the specific stress of the structure after its long-term operation, longitudinal fillet welds between the upper flange and t...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-06-01
|
Series: | Materials |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1944/13/12/2708 |