Experimental Assessment of Time-Limited Operation and Rectification of a Bridge Crane

This paper describes a problem related to a casting bridge crane with a combined load of 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. Due to the specific stress of the structure after its long-term operation, longitudinal fillet welds between the upper flange and t...

Full description

Bibliographic Details
Main Authors: Peter Frankovský, Ingrid Delyová, Peter Sivák, Piotr Kurylo, Elena Pivarčiová, Vojtech Neumann
Format: Article
Language:English
Published: MDPI AG 2020-06-01
Series:Materials
Subjects:
Online Access:https://www.mdpi.com/1996-1944/13/12/2708