Failure of a Pendent Reheater Tube in a 110 MW Thermal Power Plant
This investigation was conducted to examine the probable cause of failure of one pendent reheater tube of a 110 MW thermal power plant. Preliminary macroscopic examinations along with visual examination, dimensional measurement, chemical analysis, evaluation of mechanical properties, oxide scale thi...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter
2014-08-01
|
Series: | High Temperature Materials and Processes |
Subjects: | |
Online Access: | https://doi.org/10.1515/htmp-2013-0052 |