Optimal overcurrent relay coordination: Balancing costs, time performance and generator placement in fault current limiter optimization
Abstract The integration of synchronous generators (SG) to the grid will present serious problems in some instances. The increase in fault current level is one of the most crucial issues, which causes miscoordination between directional over current relays (DOCRs), in addition to putting excessive p...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-04-01
|
Series: | IET Generation, Transmission & Distribution |
Subjects: | |
Online Access: | https://doi.org/10.1049/gtd2.13136 |