Hydrothermal dolostones in the Shiqi quarry of Wudongde Hydropower Station, Yunnan
The Wudongde Hydropower Station in Yunan is the third hydropower station in China with a capacity of over 10 million kilowatts.The artificial aggregate used in its construction is derived from the limestone of the Mesoproterozoic Luoxue Formation of downstream the dam site.However, both limestone an...
Main Authors: | , , , , , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Bulletin of Geological Science and Technology
2021-01-01
|
Series: | 地质科技通报 |
Subjects: | |
Online Access: | https://dzkjqb.cug.edu.cn/en/article/doi/10.19509/j.cnki.dzkq.2021.0010 |