A Simulated Annealing Algorithm with Tabu List for the Multi-Satellite Downlink Schedule Problem Considering Waiting Time
In the multi-satellite and multi-ground station downlink task scheduling problem, the waiting time from the proposal of the task to the execution will affect its validity. If the satellite has multiple communicable ground stations when the downlink task is proposed, the selection problem needs to be...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-04-01
|
Series: | Aerospace |
Subjects: | |
Online Access: | https://www.mdpi.com/2226-4310/9/5/235 |