CALCULATION OF RESIDUAL LIFETIME FOR LIFTING INSTALATION – GANTRY CRANE MPT 20/5

In this paper is presented step-by-step the calculus made in order to establishing the residuallifetime of a lifting crane using also non-destructive methods to establish the actual state of machine andareas subject to study, conducting to an extension up to 5 times of residual lifetime,but at 2/3 f...

Full description

Bibliographic Details
Main Authors: Cătălin IANCU, Florin VÎLCEANU
Format: Article
Language:English
Published: Academica Brancusi 2013-05-01
Series:Fiabilitate şi Durabilitate
Subjects:
Online Access:http://www.utgjiu.ro/rev_mec/mecanica/pdf/2013-01.Supliment/24_Florin%20Vilceanu,%20Catalin%20Iancu2.pdf