Transient time determination at start up of belt conveyor for ore T.109

This work gives the method of transient time determination of the belt conveyor in the case of its start up in the example of a belt conveyor for ore at the open pit 'Veliki Krivelj" with capacity of 2000 t/h. The analysis was made by calculation procedure and it represents a universal cal...

Full description

Bibliographic Details
Main Authors: Rajković Branislav, Ilić Zoran, Mijović Radomir
Format: Article
Language:English
Published: Mining and Metallurgy Institute, Bor 2013-01-01
Series:Mining and Metallurgy Engineering Bor
Subjects:
Online Access:https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2013/2334-88361302053R.pdf